CN / EN
Home - News & Events - Walsn recently won the contract for the Huaneng Xining Thermal Power CO Monitoring Equipment Procurement Project

Walsn recently won the contract for the Huaneng Xining Thermal Power CO Monitoring Equipment Procurement Project

Time:2017-12-20 17:17

图片26.jpg

Walsn is pleased to announce that they recently won the contract for the Huaneng Xining Thermal Power CO Monitoring Equipment Procurement Project.

The project is located in Xining, Qinghai. In the east the project site is bordered by mountains and in the west by the Shihuigou; a 330kV garden transmission station is in its north.

It is one of the important thermal power projects in Qinghai. Apart from the supercritical coal-fired indirect air-cooling heating unit, the project will built simultaneously the desulfurization and denitrification system.

Walsn will be providing the Combustion Efficiency Analyzer for the project.


未标题-2.jpg

CEA-100 combustion efficiency analyzer continuously detects the contents of carbon monoxide (CO) and oxygen (O₂) in flue gas based on duplicate sensor technology. It provides an accurate, reliable and economical solution for boiler efficiency measurement. Designed for ease of maintenance and packaged for the industrial environment, CEA-100 is simple to install.

Everything Product Features

--Cutting-edge technology and free from disturbances such as loading, coal, etc.

--An outside chance to be disturbed by the air leakage of the flue

--Easy to achieve minimum heat loss and maximum combustion efficiency

-- A new strategy to control combustion – adjusting the air volume through analyzing concentration of CO and O₂

--Continuously monitoring and preventing high temperature corrosion on water wall tubes